Westgate Industrial Park · Lane County, Oregon
80 N Danebo Avenue
An AI data center in Eugene, Oregon. GPU machines are built by hand in this building, stressed until they misbehave, and racked a few metres from the bench they were assembled on — on a grid that runs roughly 90% carbon-free.

- square feet
- 28,000square feetAcross suites at 80 N Danebo. Assembly, burn-in benches and the racks the machines run in, under one roof.
- 3-phase, 480V
- 800A3-phase, 480VService per suite in a 2025 concrete tilt-up building, 21–24 ft to the deck.
- carbon-free grid
- ~90%carbon-free gridThe Willamette Valley runs on hydro. That is the reason the machines are in Oregon and not in Texas.
- power and cooling
- N+1power and coolingSized so that one failure is a repair ticket rather than an outage, with engineers in the building.
A FEW GOOD QUESTIONS
Glad you asked.
What people ask before
they put hardware in a building.
Come and look at it.
Tours are by appointment — it is a building full of other people's hardware, not a showroom. Tell us roughly what you are trying to run and we will find an hour.
80 N Danebo Ave
Eugene, Oregon 97402